Rewiring, lighting and kitchen electrics for restaurant in Shoreham

Summary

Goldies are a fast food chain, with branches in Worthing, Shoreham, and now Shoreham Beach.

The project involved a full rewire of all electrical circuits; stripping out of old electrics; installation of new fuse boxes, LED and emergency lighting; electrical supply for food counter and kitchen equipment.

Detail

  • Disconnection and removal of existing outdated electrics in premises
  • Install a new temporary site fuse box with socket outlets for trades people
  • Install new main fuse box at the main supply position
  • Install new main switch to control sub-main fuse box in the kitchen
  • Install sub-main fuse box with RCD protection in the kitchen (with MCB/RCBO fuses)
  • New lighting circuits all in LED with fire rated down lights/large flush mounted LED lights/LED lay in panels/LED drum fittings in WC’s and corridors
  • Install emergency lighting to be combined with the new lighting layout
  • Install power circuits for socket outlets in shop and service area
  • Install IP rated sockets in kitchen and food prep areas
  • Install mains voltage smoke alarm system
  • Install main supply for service/display/food heater counter
  • Testing and NICEIC certification upon completion

Timescale

There was a firm fixed completion date of 4 weeks start to finish and signing off. The project was completed fully within this timescale, with all objectives met, including additional works agreed during the installation.

Points of note

  • LED lighting was installed throughout to minimise running costs with best possible light output levels. These lights have a very long life expectancy so there are minimal maintenance costs for the duration of the fittings life
  • LED fire-rated down lights were installed to the new MF suspended plasterboard ceiling. These lights had to be fire-rated to give the ceiling a full fire rating to comply with building regulations
  • An emergency lighting system was installed to give best possible light levels during power failure
  • Liaison with main client to make sure installation was on schedule and budget due to additional works required
  • Liaison with main client, where items to be installed so as they can get best use from them
  • Liaison with main building contractors to ensure all wiring was ahead of schedule and in place for new ceiling battening and plaster boarding so as to not hold up any other trades
  • Liaison with Service/Food Counter company for sizing and positioning of required feeds; with fitting in time for installation and commissioning