Full Electrics for New Mezzanine Floor Installation at Solitek in Littlehampton
Summary
Main client: Solitek.
Sub-contracted by Stormor Systems, www.stormorsystems.co.uk.
Alteration and addition to an existing warehouse unit: to include a new mezzanine floor and office space to the first floor, reception area, warehouse, and racking space on the ground floor.
Full warehouse Mezzanine floor installation, with first-floor office partitioning with sockets and data, and kitchenette. Ground-floor partitioned warehouse racking area and shuttered workshop area with reception by front door.
Electrical Works Supplied
- Ground-floor Workshop: LED lighting installed with emergency lighting
- Ground-floor Reception: LED lighting installed with emergency lighting
- Ground-floor Warehouse: LED lighting installed with emergency lighting
- Stairs: LED lighting installed with emergency lighting
- First-floor Office: LED lighting installed, with emergency lighting
- First-floor storage racking area: Strip lighting installed with emergency lighting
- Power for offices, wall sockets fitted for desks
- Power for Air-Conditioning three-phase outside condenser
- Power for Alarm Systems
- Power for Fire Alarm system
- Fire Alarm System installed with Call Points and smoke detection
- Power for Data/Comms room (CAT6)
- Data installation for computers and phone exchange (CAT5E)
- 3-Phase power for Forklift Chargers
- Single-phase lighting fuse box installation (MCB/RCBO fuses)
- Single-phase power fuse box installation (MCB/RCBO fuses)
- 3-Phase (mains) fuse box installation
- Testing and NICEIC certification upon completion
Timescale
The project had a fixed completion date of 6 weeks start to finish and sign off.
The project was fully completed with all objectives met, including additional works, prior to this deadline.
Points of note
- LED lighting installed throughout to minimize running costs with best possible light output levels. These lights also have a very long life expectancy so there will be minimal maintenance costs for the duration of the fittings life.
- LED panels installed into new suspended ceiling. These lights have fire-rated hoods fitted to give the ceiling a full fire rating for building regulations.
- Full emergency lighting system installed to give best possible light levels during power failure.
- Liaison with main project management team to make sure installation was on schedule and budget due to additional works required.
- Liaison with main client, where items to be installed so as they can get best use from them.
- Liaison with main partitioning contractors to make sure all wiring was ahead of schedule for build to not hold up any other trades.
- Liaison with Air-Conditioning installers for sizing, quantities, and positioning of feeds required.
- Liaison with fire alarm and security alarm installers for positioning and amount of required feed, and installation.